National and international references

The Transport System Bögl is a complete in-house development by Max Bögl, which includes everything from the guideway to the vehicle and its own operations control technology. Max Bögl can draw on decades of expertise in infrastructure and railway line construction. In combination with railway tunnels and bridges, over 10,000 kilometres of the Slab Track Bögl have been laid, on which trains travel at speeds of up to 380 km/h.

Founded in 1929, the company is today one of the largest in the German construction industry with around 6,500 employees and is distinguished by its innovative strength: Max Bögl builds the world's highest wind power plants as well as industrially manufactured residential complexes - and urban magnetic railway lines.

Slab Track Bögl for Jing-Hu Highspeed Railway Joint Stock between Bejing and Shanghai

Client: Jing-Hu Highspeed Railway Joint Stock Co., Ltd.
Location: China
Construction period: Apr 2008 - Oct 2011
Value of contract: 70 Mio. €

Photo credit: Max Bögl group

Slab Track Bögl: Railway construction for Deutsche Bahn between Ebensfeld and Erfurt

Railway_EbensfeldClient: DB Netz AG
Location: Germany
Construction period: Aug 2010 - Jun 2015
Value of contract: 89 Mio. €

Photo credit: Max Bögl group

Slab Track Bögl: Railway construction for Deutsche Bahn between Berlin and Halle

Client: DB ProjektBau GmbH
Location: Germany
Construction period: Mar 2013 - Jun 2013
Value of contract: 40.4 Mio. €

Photo credit: Max Bögl group

Slab Track Bögl: High speed railway track for Israeli Railways in Israel

Client: Israeli Railways Ltd.
Location: Tel Aviv, Israel
Construction period: Mar 2013 - Jun 2013
Value of contract: 36.1 Mio. €

Photo credit: Werner Meier

Slab Track Bögl: High speed railway track for Deutsche Bahn between Cologne and Frankfurt

Client: DB Projekt GmbH Köln - Rhein/Main
Location: Deutschland
Construction period: Aug 97 - Mrz 02
Value of contract: 802 Mio. €

Photo credit: R. Mederer

Construction of the railway tunnel Finnetunnel for Deutsche Bahn in Buttstätt

Client: Deutsche Bahn AG
Location: Germany
Construction period: Dec 2006 - Mai 2012
Value of contract: 247 Mio. €

Photo credits: Günter Schwenzel

Extension of the ungerground network in Nuremberg for City Nuremberg

Client: City of Nuremberg
Location: Germany
Construction period: May 2007 - May 2010
Value of contract: 39.6 Mio. €

Photo credits: Frank Tölle

Extension of the underground network in Hamburg for Hamburger Hochbahn

Client: Hamburger Hochbahn AG
Location: Germany
Construction period: Nov 2014 - Sep 2016
Value of contract: 9.5 Mio. €

Photo credits: Thilo Dicke

Construction of "Albabstiegstunnel" for Deutsche Bahn

Client: Deutsche Bahn AG
Location: Germany
Construction period: Aug 2013 - Jul 2019
Value of contract: 298 Mio. €

Photo credits: Arge Tunnel Albabstieg

Energy storage project "Naturstromspeicher Gaildorf"

Water Battery Project with the worlds highest onshore wind turbine (178 m HH)
Client: Max Bögl group
Location: Germany
Construction period: 2016 - 2020

Photo credits: Max Bögl Wind AG / Reinhard Mederer